What is a preliminary agreement?

Share This Post

Share on facebook
Share on linkedin
Share on twitter
Share on email

 

What kind of service is provided in a preliminary agreement?

 

A preliminary agreement is a pre-construction agreement between the client & the Builder. The agreement allows the builder to further investigate the project & obtain enough information & documentation to define the works required & create a scope of works to provide a cost analysis. The agreement will usually list the items required & the Builders fee to cover his time & costs. Depending on what stage the client is at, some of the preliminary work that can be undertaken by Managed Build includes

  • Feasibility study
  • Identification Survey
  • Detailed and Contour survey
  • Soil or geotechnical report
  • Engaging of designer/architect to draw up a concept and subsequently detailed design
  • Engineering design
  • Town planning advice
  • Other specialist consultant reports
  • Locating existing infrastructure within the site
  • Cost analysis/ Detailed Quoting

A client in the early stages of their building journey may require us to engage an Architect or Designer or may require us to perform all tasks in the list. If the client has already got these documents in order, Managed Build may only be required to review the documents and produce a cost analysis or detailed quotation.

Can we provide a square meterage rate?

 

We get asked that a lot. How much a square meter? The reality is, for a custom-built project, there is no set rate. Each project has its own unique specific requirements & challenges. In short, no two projects are ever the same, no site conditions are the same, and no two clients are the same A square meterage rate can be useful in the early planning stages to work out roughly what the project would cost. For example, if your block size was 500 square metres & your zoning allowed for a floor space ratio of 0.5:1 you could allow 250 square metres X (sqm rate) to obtain a rough idea on what the building itself would cost to build. Again, this rate should be adjusted to allow for level of finish, level of difficulty & inclusions etc. This rate needs to be verified by the builder by doing a proper quote. In most cases the rate applied at the beginning of the design process is different to the ultimate cost.A proper cost analysis or quote requires the builder to fully understand the plan, scope of work, site conditions, and time constraint.

Like assembling a jigsaw puzzle, each piece needs to be identified & priced accordingly, then assembled to provide the final figure.

Some builders provide a free quote, why do you charge a fee?

 

In order for a quote to of any real value, it has to be accurate & contain clear and detailed information for both parties. An accurate quote takes a significant amount of time and money to prepare as each project is different in scope and site conditions involving many separate trades & calculations to arrive at a figure. It is easy to get a free quote, but those builders will not want to spend the time or effort. They can apply a square meterage rate or low ball the quote and make up their margin by lowering quality or adding extras during the build. Too often the owner engages the lowest cost builder because they don’t understand the quote. What sounds like a good deal in the beginning can end up more costly or the project fails to achieve the desired result. A paid service allows us to spend more time to investigate in depth. In particular for renovation work, multiple site visits and confirmation may be required. If we are willing to enter into an agreement with you, we are committed to producing a quality quote with the whole scope assessed & unforeseeable items allowed for.

We also acknowledge that if we do not win the job, our expenses will NOT be recouped from the fee we charge. During our initial consultation, we will estimate if the owner’s budget is workable. If we believe there is a mismatch, we will not offer this service.

What documents are required for a quote?

 

If we are provided with accurate and detailed documentation, the quote produced will be precise. For a typical project, 1-4 week turn around can be expected. On the other hand, if the document is lacking, the quoting process can be done in a couple of days. This is often the case if the client is seeking an estimate during the design process. A basic concept drawing can be used provided that the client understands accuracy may be poor. Ideally, a detailed set of architectural drawings, engineering design, soil test report, schedule of finishes, and fitting will be a basic minimum requirement.

How much do you charge for a quote?

 

The fee ranges between $275 for an estimate to $3,300 depending on the complexity and size of the job.

What is the difference between a Bill of quantity (BQ) provided by a Quantity Surveyor (QS) and a builder’s quote?

 

For a custom build project over $800,000, it is normal practice to engage the service of a Quantity Survey (QS) and work with a Bill of Quantities (BoQ) early in the design process. The main purpose of a BoQ is to itemise and define a project so that all tenderers are preparing their price and submission on the same information. It is not uncommon to find that the quotes from builders differ to the BoQ report, this can be due to:

  • Tendering builder’s capacity and workload in their pipeline
  • Quality of the trades that the builder employ
  • General market conditions at the time of tender
  • Builder’s different assessment of the project risk

Each builder has a different assessment of project risk and applies a different methodology to run the project. Managed Build ensures all projects delivered are tested through our rigorous quality assurance programs before being handed over. We have developed systems and procedures to allow a consistent level quality.

What are Prime Cost (PC) and Provisional Sums (PS)

 

To make the quote/contract as accurate as possible, you need to define what exactly is going to be included down to details such as what bulbs you are going to use. Sometimes, that is not possible at the time of quoting or contracting. There are two common terms used to allow for such variables.

Prime Cost Item (PC):

Is an allowance made in a tender or contract for the supply and delivery only of an item or items of material (e.g. taps, baths, light fittings etc.) that have not been selected at the time of tender or before the contract is signed or for which the Contractor was not able to provide a fixed price on before entering into the contract. The Client/Owner will normally make the final selection of the item which is subject to a PC allowance.

Provisional Sum (PS):

Is an allowance made in a tender or contract for particular work which could not be finalised before tendering or signing a contract and which includes the total cost of the supply and installation (e.g. joinery, landscaping, air conditioning, rock removal) Where Prime Cost Items (PC’s) and Provisional Sum items (PS) allowances have to be shown in a tender or contract document, the amount shown should be inclusive of GST. e.g

  • Tile allowance PC $35/m2 (inclusive of GST)
  • Landscaping Provisional Sum $10,000 (inclusive of GST)

How PC and PS can affect the contract price

 

Unlike a variation, PC and PS are adjustments to a contract. If you want a firm contract, it is better to have as little PC and PS as possible, making the builder carry all the risk of supplying the items. If you want to share some of that risk, having an agreed PS or PC can work in your favour. A good example is site cut where it is difficult to work out how much soil will be excavated and carting away the excess spoil due to tip location, traffic conditions of the day etc.

This example shows agreed PS allowance of $10,000 (GST inc) and the total cost to cut the site in 3 different scenarios: Work is done less than the allowance at $8000, work is done as per allowance $10,000 and work is done for more than the allowance $12,000.

 

Case #

1

2

3

A

Actual Cost (inc GST)

$8,000.00

$10,000.00

$12,000.00

B

Ex GST (A/11)

$7,272.73

$9,090.91

$10,909.09

C

PS allowance per quote/contract

$9,090.91

$9,090.91

$9,090.91

D

adjustment (B-C)

-$1,818.18

$0

$1,818.18

E

contractors agreed margin (Dx0.2)

$0

$0

$363.64

F

Subtotal (D+E)

-$1,818.18

$0

$2,181.82

G

GST (Fx0.1)

-$181.82

$0

$218.18

H

total adjustment (F+G)

-$2,000.00

$0

$2,400.00

I

original contract price (inc GST)

$500,000.00

$500,000.00

$500,000.00

J

Adjusted total (inc GST) (H+I)

$498,000.00

$500,000.00

$502,400.00

What is an Identification Survey? Why do I need one?

 

A survey which is required for the purpose of identifying existing buildings and improvements on a parcel of land is referred to as an Identification Survey or just Ident. It may only be undertaken by a Registered Surveyor. It is always recommended to engage a Surveyor for an Ident survey when you are purchasing a property. Your solicitor will normally obtain an Ident report as a matter of course. He does so to protect you against any problems which can only be detected by a Surveyor. The Vendor Disclosure Legislation requires obligatory warranties and other statutory information from a vendor of the property. The Ident report can supply other required information and speed up the sale. Through your Ident Survey you can be sure that you are not buying any problems that may make the property is not difficult to sell in the future or create anxiety with neighbours or public authorities before you even move in. More importantly, you are sure that you are buying the property that you have been shown and whether the property has any defects which may devalue it. A Surveyor measures the site involved to determine the location of buildings on or adjacent to the land and any fences present. He will check for the existence of Easements (for drainage, etc.), Covenants and Restrictions on land use, and whether the subject land complies with the terms of these conditions. The Surveyor pays special attention to any encroachments by or upon the land or upon any Easements. In the instance of a residence the Surveyor will report on the distances of the walls or eaves and gutters from the side boundary of the land.

Source: Consulting surveyors NSW http://www.acsnsw.com.au/content/157/identification-surveys.aspx

What is Contour and Detail survey

 

Detail surveys are a basic requirement for building and land development. In most cases, the purpose of detail surveys is to indicate features on, and adjacent to, a property. There are a number of site features and levels required by architects and planners. A topographic survey is a vital component of a successful development application for any development of your land.

Features of general detail surveys include:

  • Levels & contours related to Australian Height Datum (AHD)
  • Title information
  • Field survey of site detail & features
  • Field location of visible services 9sewerage, power poles etc.
  • Spot levels & contours over site
  • Detail of significant trees on site over 0.2 diameter trunk
  • Note of retaining walls, changes of grade etc. onto adjoining sites
  • Ridge and gutter heights for adjacent buildings.
  • Location of existing and adjoining houses/structures and floor and apex levels
  • Levels of kerb & other critical features
  • Place site level datum
  • Outline of adjacent levels

Dial before you dig searches

 

Projects involving excavation will require an assessment to find out what services are underground around your property. Common searches include:

  • Telecommunication location
  • Gas lines location
  • Sewer main and water supply lines
  • Storm water main
  • Underground electricity supply

Managed Build can advise if there are problems connecting your house to the mains, common problems can be

  • Unavailability connection to the sewer main or sewer main,
  • Manhole located on your block
  • Unavailability of storm water main for legal point of discharge

Town planning and overlay constraint

 

Part of the preliminary searches will involve extracting information from council regarding your property. Most of these searches are done through publicly available data. Managed Build can help you make sense of the search result. We pay attention to these common constraints:

  • Zoning of your property
  • If the old house is protected or if it’s in a heritage conservation area if you are seeking to knockdown and rebuild
  • If the property is affected by flood, or is in the overland flow path
  • If there is protected vegetation on your site
  • Heritage listing
  • Bush fire zoning
  • Indicative contour of the site

The result will determine if we need to call on other specialist consultants such as a town planner.

Soil Testing and why do I need it
 

The types of soil usually present under the topsoil in land zoned for residential building can be split into two approximate groups – granular and clay. Quite often, the foundation soil is a mixture of both types. The general problems associated with soils having granular contents are usually caused by erosion. Clay soils are subject to saturation and swell/shrink problems. Soil classification for a given area can be obtained by getting a geotechnical report (or soil test report). As most buildings suffering movement problems are founded on clay soils, there is an emphasis on classification of soils according to the amount of swell and shrinkage they experience with variation of water content. 

See the table below from Part 3.2.4 of the National Construction Code

 
   

Table 3.2.4.1 General definition of site classes

 

Class

Foundation

A

Most sand and rock sites with little or no ground movement from moisture changes

s

Slightly reactive clay sites with only slight ground movement from moisture changes

M

Moderately reactive clay or silt sites which can experience moderate ground movement from

moisture changes

H

Highly reactive clay sites which can experience high ground movement from moisture

changes

E

Extremely reactive clay sites which can experience extreme ground movement from

moisture changes

Ato P

Filled sites – see AS 2870

p

Sites which include soft soils, such as soft clay or silt or loose sands; landslip; mine

subsidence; collapsing soils; soils subject to erosion; reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise


Note to
Table 3.2.4.1: For classes M, H and E further division based on the depth of the expected movement is required . For deep-seated movements, characteristic of dry climates and corresponding to a design depth of suction change H , equal to or greater than 3 m, the classification shall be M-D, H-D or E-D as appropriate. For example, H-D represents a highly reactive site with deep moisture changes, and H represents a highly reactive site with shallow moisture changes.

Subscribe To Our Newsletter

Get updates and information about building in Sydney

More To Explore

News & Articles

Why the Eastern Beaches are the best places to build

With breathtaking coastlines, pristine beaches, bustling eateries and plenty to do, it’s no wonder Sydney’s Eastern Beaches are a prime choice for new home builds, renovations and extensions. Whether you’re a young professional looking for an urban oasis to call

General Building

5 reasons to choose an inner-city building specialist

There are many upsides to living in the vibrant heart of Sydney – from easy access to fine-dining restaurants, upscale bars and transport, to the fact that your inner-city property will likely continue to go up in value. However, crafting

Do You Want To start building?